Almost a bathroom

The plasterers have worked their magic on the bathroom and it is really taking shape. The walls and ceiling are plastered and the window recess has been finished beautifully with rounded edges. This has all been done in modern plaster on moisture resistant plasterboard, so was completed very quickly. The shower area is ready for… Continue reading Almost a bathroom

Heavy metal

This roll of lead weighs the same as a grown man. This is the super thick lead (code 6) that will be going on the cheeks of the dormers. The lead that was retro fitted into the oak frame yesterday. The front of the dormers are being rendered, but they need a lead sill to… Continue reading Heavy metal

Super busy day

Further great progress was made today with the plastering, the roof and the timbers. The stud wall between the landing and Zanna’s bedroom has had the traditional laths added ready for the lime plaster. Alan meticulously adding the lime plaster. This bit of wall was originally (badly) constructed with chip board and pine and was… Continue reading Super busy day

Float coat

A short post today as it was a quiet day with only Charlie and Mitch on site and, after a morning of painting windows, Cat spent the afternoon asleep on the sofa. Charlie and Mitch are working on the second ‘float’ coat of lime plaster and plastering the ceiling in Zanna’s bedroom. The ‘float’ coat… Continue reading Float coat